Yes, due to the nature of the upgrade, ECMWF will transfer all installed requirements in the test PREd to the production system on the day of the cycle implementation. During the RCP, any changes made in the production system should also be installed in the test system to ensure continuity. |
- If you're a Basic/Bronze user, the Data Support team can push a test batch of IFS Cycle 50r1 data to the host configuration.
- If you're a Silver/Gold user, then you can either push the data to yourself or set the data to be delivered in 'NORMAL' mode. If you put the data in 'NORMAL' mode, the data will be disseminated to your host automatically. However, the data are disseminated between operational windows to protect network capacity, meaning the data will not be disseminated according to the usual dissemination schedule. There is no fixed delivery schedule, and products may not be available in real time, delays of up to one day are possible.
Note: 'NORMAL' mode will not be available until w/c 2nd March 2026. |
The data are disseminated between operational windows to protect network capacity. There is no fixed delivery schedule, and products may not be available in real time, delays of up to one or days are possible. Usually as we get close to implementation the delay gets smaller. |
The same TOTP token should be used for the xdiss as for the diss system. |
No, the test data are strictly for non-operational use. Test products are intended for internal testing and validation only and must not be used in operational services or shared on social media. |
In the test PREd (TPred), you will be able to test as much data as you want (even over your current Volume Band), however when it comes to operational day, if you have made changes that are over your current Volume Band, you will need to do an amendment to your current contract. |
No, this will not work. You should use the TPREd to install test data. |
Not necessarily. The host configuration of the test system might not be in sync with the operational system. You also might want to receive the data files at a different endpoint. In case, you would like to make changes, please indicate this in the form: RCP 50r1 - Test System User Details or contact us via https://support.ecmwf.int |
IFS Cycle 50r1 beta test data is available from MARS with E-suite experiment version (expver) 0080 (MARS keywords EXPVER=0080, CLASS=OD). However, these data are not open to commercial users. |
Indeed, the control will be disseminated earlier. See the control forecast schedule in this page: Dissemination schedule |
For IFS Cycle 50r1, Ensemble Control forecast (ENS-cf) will become oper-fc and will not have perturbationNumber=0. The plan is to change this in IFS Cycle 50r2, with the GRIB2 migration. |
Yes, we will provide re-forecast products to allow creation of a model climate for both medium-range and extended-range. This will be provided in the next few weeks and more information will follow when they are available. |
For Basic and Bronze users, once you've confirmed that you're "Ready to Migrate" with the Data Support team, on the day of implementation, the esuite (TPREd) will become the operational (PREd). This means all the data requirement changes that were done to test yourI FS Cycle 50r1 data requirements, will start to be delivered operationally. |
|