Detailed description of the new notification criteria.
The new formal flood notification criteria are:
1. Catchment part of Conditions of Access (CoA), i.e., within the EFAS partner region.
2. A catchment area of at least 1000 km².
3. A total probability of exceeding the EFAS 5-year return period of at least 50%.
4. The onset of the event will occur between 2 and 7 days from the forecast time. E.g., for the forecast 2024-08-13 00UTC, the event must start between 2024-08-15 06UTC and 2024-08-20 00UTC. The onset of the event is the first time step when the probability criterion in point two is fulfilled.
An informal flood notification will be issued when any of the criteria above is not met, but the forecaster deems that the authorities should be informed. To issue an informal notification, the exceedance probability must be at least 40% and the catchment area at least 500 km².
As a consequence of the new combination method and the new notification criteria, the following EFAS products have been changed: