Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Confirmed.

Description of the upgrade

The production of rain in convective parametrisation scheme and the evaporation efficiency over land was modified due to the over-forecasting of precipitation (particularly over Europe) and the marked negative bias in the 2m temperature in daytime (in particular when dry, sunny conditions were observed). After the correction was introduced, the over-forecasting of precipitation was eliminated and the 2m temperature bias was reduced.

Note

Implemented: 18 July 1985  

Panel
titleColor#ffffff
titleBGColor#00A4C4
titleContents of this page

Table of Contents
maxLevel2

Panel
titleColor#ffffff
titleBGColor#00A4C4
titleRelated links
Panel
titleColor#ffffff
titleBGColor#00A4C4
titleAll IFS cycles
Children Display
depth1
pageChanges to the forecasting system