...
Some forecast parameters are not strictly valid at the specified time, but over a processing period. During this period, the parameter could be accumulated, averaged or the minimum/maximum could be calculated, from the values at all the model time steps during the processing period. For more information, see ERA5 terminology: analysis and forecast; time and steps; instantaneous and accumulated and mean rates and min/max parameters
...